Cost of Concrete Poly Jacking in Chippewa Falls
Concrete poly jacking, also known as polyurethane foam injection, is a popular method for repairing sunken or uneven concrete surfaces in Chippewa Falls, WI. This cost-effective and efficient technique involves injecting a high-density polyurethane foam beneath the concrete to lift and stabilize it. Understanding the factors affecting the cost and the common tasks involved can help homeowners and businesses budget for this essential maintenance service.
Factors Affecting Cost
- Size of the Area: Larger areas require more material and labor, increasing overall costs.
- Extent of Damage: More severe damage may necessitate additional foam and longer labor time.
- Accessibility: Hard-to-reach areas may incur extra charges due to the complexity of the job.
- Foam Material Quality: Higher quality foam materials can be more expensive but offer better durability.
- Labor Rates: Local labor rates in Chippewa Falls, WI, can influence the total cost.
- Preparation Work: Any necessary preparation, such as cleaning or drilling, can add to the cost.
- Travel Fees: Depending on the contractor’s location, travel fees may be included.
Average Costs for
Task/Service | Average Cost (USD) |
---|---|
Small Residential Repairs | $500 - $1,000 |
Medium Residential Repairs | $1,000 - $2,500 |
Large Residential Repairs | $2,500 - $5,000 |
Commercial Repairs | $5,000 - $10,000 |
Foam Material (per cubic foot) | $15 - $25 |
Labor (per hour) | $50 - $100 |
Travel Fees | $50 - $200 |
By understanding these factors and average costs, residents and businesses in Chippewa Falls, WI, can make informed decisions when planning their concrete poly jacking projects.